in BIM we trust

BIM

in

box

building information model all in one box

Dear Colleagues,

I am Andrii, the owner of this Freelance Agency. I am a highly skilled Architect and BIM developer with extensive experience in ArchiCAD (LOD 400). Throughout my career, I have accumulated over 10 years of professional experience, including 6 years of obtaining a Master of Architecture degree, and 14 years of using ArchiCAD. Since 2020, I have collaborated with architects on various projects as a freelancer. You can find customer feedback on this page.

In addition to my architectural services, I have expertise in creating comprehensive Hyper BIMx models that include all relevant information on architecture, engineering, and construction (AEC) of buildings.

All of the portfolios works that I present are the result of successful team collaboration. I had the opportunity to contribute to these projects during my previous office career.

I am committed to delivering excellent results and am always looking for new opportunities to utilize my skills and knowledge.

 andrii.bielov@gmail.com

Feedbacks on my works on Upwork and Fiverr

Participated projects (2014-2019) 

SLAVUTICH

Residential Mixed-use complex

I developed one of these buildings. Participated as a subcontractor – architecture development and BIM coordination.
Make the Building Information Model LOD 400 for such a complicated object was necessary because of hardship designing AEC industries by separated subcontractors. Detailed design documentation for this object was published from the BIM model. During the working process in the BIM model although was accomplished collision detection between all players.
My first big project in Kyiv

Click here to read more about complex

Size – 122 260 m2

Client –  bUd development

AEC design – Archimatika

Visualization – MINDNESS

Year -2016 – …

SLAVUTICH2.0

Residential Mixed-use complex

I developed long eight-storey building on the front line. Participated as a subcontractor – architecture development and BIM coordination.
Make the Building Information Model LOD 400 for such a complicated object was necessary because of hardship designing AEC industries by separated subcontractors. Detailed design documentation for this object was published from the BIM model. During the working process in the BIM model although was accomplished collision detection between all players

Click here to read more about complex

Size – 103 760 m2

Client – bUd development

AEC design – Archimatika

Visualization – MINDNESS

Year – 2017 – …

WhiteLines

Residential Mixed-use complex

I developed the low-rise part of this complex which connected all residential buildings in one composition. Participated as a subcontractor – architecture development and BIM coordination.

Made the Building Informational Model LOD 400 for such a complicated object was necessary because of hardship designing AEC industries by separated subcontractors. Detailed design documentation for this object was published from the actual BIM model. During the working process in the BIM model although was accomplished collision detection between all players.

Click here to read more about complex

Size – 125 000 m2

Client  – A Development

AEC design – Archimatika

Year – 2017 – …

Rybalskyi

Residential Mixed-use complex

Participated as a subcontractor – architecture development and BIM coordination.
Developed Design Documentation within national low limitations for government approval commission. The end product was BIM model LOD 300.
During the working process in the BIM model although was accomplished collision detection between all players.

Size – 68 000 m2

AEC design – Archimatika

Year – 2018

Polyanka/44

Residential Mixed-use complex/ Reconstruction

Participated in architecture development. Designed technical drawings for tender documentation for the reconstruction buildings

Click here to read more about complex

Size – 32,000m2

Client – PSN

Architect – John McAslan + Partners

Executive Architect – ADM

Landscape Architect – Gillespies Architects

Multi-disciplinary Engineers – Buro Happold

Year – 2018

Volga

Apart-complex

Role: Participated as subcontractor – architecture development.

Developed Detailed design documentation

Click here to read more about complex

Size – 30 300 m2

Client – shater-development

Architects – ADM

Year – 2014